Automation
Explore Main Sequence guides about automation.
Main Sequence assembler automation guide: Feed Inputs and Route Finished Parts
Use a playtest circuit-board example to plan assembler inputs, route outputs, and verify that a Main Sequence production line runs.
Read guideMain Sequence best factory layout: A Compact Line With Space to Expand
Build an expandable Main Sequence factory with short belt runs, visible handoffs, and a reserved side for the next production line.
Read guideMain Sequence conveyor belt setup: Connect Machines and Test Your First Line
Connect Main Sequence station machines with belts, test one material path, and find the first gap before expanding your factory.
Read guideMain Sequence factory power setup: Feed a Station Reactor With a Verified Supply Line
See how one Main Sequence playtest factory routed hydrogen cells from an ice facility to a station reactor and tested the supply path.
Read guideMain Sequence production ratios guide: Turn Recipe Cycles Into Belt and Feed Rates
Calculate Main Sequence assembler inputs per minute using recipe quantities and cycle time, with a versioned circuit-board example.
Read guideMain Sequence refinery not working: Check Real Power and Output Before Rebuilding
Troubleshoot a stalled Main Sequence refinery by checking power, input, and output, including a September playtest sound and animation bug.
Read guide